Corin Dam

1–2 minutes

Since construction, the lowest four construction joints in the inlet tower at Corin Dam had been leaking, leading to progressive deterioration of the concrete structure and posing a long-term risk to the asset’s structural integrity.

After multiple unsuccessful remediation attempts, National Concrete Solutions (NCS) was engaged to deliver a durable repair solution and installation methodology capable of addressing the leaks within the 60-metre-deep water-retaining structure, while also extending the asset’s service life.

Working within a highly constrained environment – a 6-metre-diameter inlet tower – NCS developed and implemented project-specific safety measures to ensure safe access and execution of the works.

Drawing on extensive experience with specialised remediation products, NCS also developed a tailored application methodology suited to the challenging site conditions, including deteriorated concrete and active water ingress. In the first stage, a fast-setting crystalline hydraulic cement compound was applied to rapidly and effectively stem water flow through the leaking construction joints.

Given the prolonged leakage and resulting severe concrete damage, a secondary high-build repair system was then applied to resurface the deteriorated areas, followed by a protective coating to fully waterproof the structure and safeguard it against high hydrostatic pressures.

By utilising NCS’s Best Practice Management certifications and associated procedures, the project was delivered within a controlled and safe working environment, ensuring effective access management and achieving a zero-incident outcome.